Dundee, Scotland
The Michelin man goes Green
Perhaps inspired by Ford’s example, perhaps by rising energy prices and maybe even the green agenda – or a little bit of all three. Who knows, who cares.
Michelin decided to give wind energy a role in their operations, a serious role mind you.
We built two large windmills at their tyre factory, pretty much in the heart of Dundee. A real challenge for our good neighbour policy.
We rose to that challenge, with a very carefully designed and constructed wind park, and the best technology available – slow, elegant and whisper quiet.
Our two windmills here provide roughly 30% of the electricity required for the factory which makes about 7 million tyres every year.
So that’s engines for Ford and tyres for Michelin, what parts of a car can we wind power next? Actually the whole car, if we have our way...
Vital statistics
Site address - Michelin Tyre PLC, Dundee, Scotland
Running Since - 20 May 2006
Turbines - 2
Hub height - 85m
Rotor diameter - 71m
Capacity - 4MW
Green electricity per year -
8 million units
Equivalent homes - 2,242
CO2 savings - 7,128 tonnes