East Kilbride, Glasgow

Our first Merchant Wind Power wind park. Providing enough green energy to power over a third of Sainsbury’s distribution centre in Glasgow.

Merchant Wind Power (MWP) is about building wind turbines on industrial sites, delivering green electricity at the point of use.

Built in 2001, we completed our first project at Sainsbury’s, the UK’s first fully commercial wind turbine.

“Ecotricity has helped us meet our environmental goals and energy needs” – Julius Brinkworth, Sainsbury’s

Drawing of battery

1.1 million units

(kWh/year)

Drawing of green house

307 homes

powered each year

CO2 in green cloud with arrows pointing down

246 CO2 savings

(tonnes/year)

Location & Operation

 

Location: East Killbride, Glasgow

 

Windmills: 1

 

Operation Since: Thursday, 1 March 2001

Technical Specifications

 

Model: Enercon EP1 E-40

Power: 600 kW

Rotor Diameter: 40.3 m

Hub Height: 65.0 m

Tip Height: 85.0 m

Wind Speed: 2.5 – 34.0 m/s

Switch to 100% green electricity from the wind

You can switch to green energy for your home or business online. It only takes a few seconds.