This winter view shows that only part of turbine 2 will be visible from a position near the Church of St Nivet. Topography and vegetation screen the view to turbines 1, 3 and 4 from this position even though the ground level elevation of the turbines is approximately 100m higher.
Contact us at
reperrycross@
ecotricity.co.uk
Copyright 2007
The Renewable Energy Company
Existing viewpoint 3
Proposed viewpoint 3