Construction photos - Phase 3: Second Turbine Construction


 





page 1 | page 2 | page 3 | page 4

<< Back

Vital Statistics

Michelin Tyre Factory, Dundee

Site address -
Michelin Tyre PLC, Baldovie Road, Dundee, DD4 8UQ

Installed - May 2006

Turbines - 2

Equivalent homes - 2,242

Hub height: 85m

Capacity - 4MW

Generation kWh - 8 million

Rotor diameter - 71m

Carbon dioxide (CO2)
savings - 7,128 tonnes

Sulphur dioxide (SO2)
savings- 122 tonnes

Nitrogen oxide (NOX)
savings - 33 tonnes

 

Download the pdf factsheet here